Outdoor Cabinet Series Industrial and Commercial Energy Storage System
Description
Huijue Group's industrial and commercial energy storage system adopts an integrated design concept , integrating batteries in the cabinet, battery management system BMS , energy management system EMS , modular converter PCS and fire protection system . The modular design can be flexibly expanded to adapt to various scenarios . It has the functions of power grid voltage regulation, three-phase unbalance control, harmonic control, etc., which can improve power quality, load tracking, backup power supply , peak shaving and valley filling. Reduce energy costs for enterprises, increase green energy use, and maintain safe and stable system operation.
Features
1.Fast power response, supporting multiple modes such as virtual power plant, grid-connected , and off-grid
2.All-in-one design greatly reduces transportation, on-site installation time and cost
3.Local collection, intelligent monitoring, remote operation and maintenance
4.Standardized interface can connect multiple machines in parallel, easy to expand and produce in batches
5.Intelligent installation, operation, node self-adaptation, fault indication, reducing on-site and operation and maintenance workload by 70%
6.No isolation design, efficiency improvement Independent single cluster battery , no circulating current to reduce power loss
7.Six-layer security protection design multi-information fusion
8.Local / remote upgrade, broadcast program upgrade, point-to-point upgrade efficiency increased by more than 90%
Shaving peaks and filling valleys
During peak electricity , reduce expensive electricity bills
Improve the stability of power system
By storing electricity and dispatching it when needed
Backup power
When the grid is out of power,use as backup power in areas without power
Peak valley arbitrage
Arbitrage by using peak and valley electricity prices in different time periods
The utilization of renewable energy
The day maximize photovoltaic power usage, while excess power is stored for use at night
Costs for power grid upgrades
Reduce the initial investment in power grid construction under the application of distributed power system scenarios
Product model : HJ-ESS-115A ( 50KW/115KWh )
System Topology